Developed the second largest BTM solar project in PG&E territory on quarry brownfield. The 2nd oldest contractor in CA, GraniteRock achieved 65% energy savings. CO2 offset of 171k tons.

About the Project

About the Project

About the Project

415kW

415kW

415kW

Solar PV

Solar PV

Solar PV

20 acres

20 acres

20 acres

Square Footage
Square Footage
Square Footage

2023

2023

2023

Year Completed
Year Completed
Year Completed

Phase I - 5.7 MWdc Ground mounted Solar PV - developed, designed and managed the delivery of the 5.7 MW solar project for Graniterock. Transmission voltage Interconnection with 4 mile 60kV Tie-in. Phase II - 4 MW/8MWh BESS - engineering and interconnection study in progress.

The Overburden pile at the Quarry, where the array is located, had been in a state reclamation process so could not be utilized for other purposes. MYNT and Graniterock took advantage of two key regulatory policies: the eligibility for renewable energy projects on property in reclamation, and a CEQA exemption for renewables on minelands in reclamation. The project is the 2nd largest Behind-the-Meter solar installation in PG&E territory and represents a 60% offset of the Quarry’s annual energy demand.