We design, engineer, develop, and build
world-class clean
energy systems that
outperform the market.
Vertically-Integrated Energy
By having everything in-house, we streamline project timelines, budgets, and ensure a better product.
Design
Engineering As a Service (EAAS)
Construction
PM + Accounting
Operations + Maintenance
Vertically-Integrated Energy
By having everything in-house, we streamline project timelines, budgets, and ensure a better product.
Design
Engineering As a Service (EAAS)
Construction
PM + Accounting
Operations + Maintenance
Vertically-Integrated Energy
By having everything in-house, we streamline project timelines, budgets, and ensure a better product.
Design
Engineering As a Service (EAAS)
Construction
PM + Accounting
Operations + Maintenance

AMPS
Asset Management Performance Services
AMPS is the intelligence layer to the VPP. O&M included + Investment Grade Revenue + performance guarantees, optimizing revenue and savings over time.
Trusted by the best
Projects That Deliver (And Last)
We have designed, built, developed, and managed assets for over a decade. These are some of our favorites.

Fireclay Tile
Hand made tile manufacturer based in California achieves 60% energy offset with new rooftop PV and ESS installation.
580kW
System Size
500kWh
Battery Storage (BESS)

County of Monterey
Partnered to develop a solar + battery micro-grid for the county’s main administrative building. The project resulted in an estimated 25-year savings of $8.5 million. CO2 offset of 30k tons.
1.4MW
System Size
2,100kWh
Battery Storage (BESS)

Beckmann's Bakery
In collaboration with ownership, MYNT converted a distressed facility into a solar powered commercial bakery with an energy value-add of $125k per year (~$.25/sqft). CO2 offset of 10k tons.
415kW
System Size

GraniteRock
Developed the second largest BTM solar project in PG&E territory on quarry brownfield. The 2nd oldest contractor in CA, GraniteRock achieved 65% energy savings. CO2 offset of 171k tons.
5.7MW
System Size

Fireclay Tile
Hand made tile manufacturer based in California achieves 60% energy offset with new rooftop PV and ESS installation.
580kW
System Size
500kWh
Battery Storage (BESS)

County of Monterey
Partnered to develop a solar + battery micro-grid for the county’s main administrative building. The project resulted in an estimated 25-year savings of $8.5 million. CO2 offset of 30k tons.
1.4MW
System Size
2,100kWh
Battery Storage (BESS)

Beckmann's Bakery
In collaboration with ownership, MYNT converted a distressed facility into a solar powered commercial bakery with an energy value-add of $125k per year (~$.25/sqft). CO2 offset of 10k tons.
415kW
System Size

GraniteRock
Developed the second largest BTM solar project in PG&E territory on quarry brownfield. The 2nd oldest contractor in CA, GraniteRock achieved 65% energy savings. CO2 offset of 171k tons.
5.7MW
System Size

Fireclay Tile
Hand made tile manufacturer based in California achieves 60% energy offset with new rooftop PV and ESS installation.
580kW
System Size
500kWh
Battery Storage (BESS)

County of Monterey
Partnered to develop a solar + battery micro-grid for the county’s main administrative building. The project resulted in an estimated 25-year savings of $8.5 million. CO2 offset of 30k tons.
1.4MW
System Size
2,100kWh
Battery Storage (BESS)

Beckmann's Bakery
In collaboration with ownership, MYNT converted a distressed facility into a solar powered commercial bakery with an energy value-add of $125k per year (~$.25/sqft). CO2 offset of 10k tons.
415kW
System Size

GraniteRock
Developed the second largest BTM solar project in PG&E territory on quarry brownfield. The 2nd oldest contractor in CA, GraniteRock achieved 65% energy savings. CO2 offset of 171k tons.
5.7MW
System Size

Fireclay Tile
Hand made tile manufacturer based in California achieves 60% energy offset with new rooftop PV and ESS installation.
580kW
System Size
500kWh
Battery Storage (BESS)

County of Monterey
Partnered to develop a solar + battery micro-grid for the county’s main administrative building. The project resulted in an estimated 25-year savings of $8.5 million. CO2 offset of 30k tons.
1.4MW
System Size
2,100kWh
Battery Storage (BESS)

Beckmann's Bakery
In collaboration with ownership, MYNT converted a distressed facility into a solar powered commercial bakery with an energy value-add of $125k per year (~$.25/sqft). CO2 offset of 10k tons.
415kW
System Size

GraniteRock
Developed the second largest BTM solar project in PG&E territory on quarry brownfield. The 2nd oldest contractor in CA, GraniteRock achieved 65% energy savings. CO2 offset of 171k tons.
5.7MW
System Size

Fireclay Tile
Hand made tile manufacturer based in California achieves 60% energy offset with new rooftop PV and ESS installation.
580kW
System Size
500kWh
Battery Storage (BESS)

County of Monterey
Partnered to develop a solar + battery micro-grid for the county’s main administrative building. The project resulted in an estimated 25-year savings of $8.5 million. CO2 offset of 30k tons.
1.4MW
System Size
2,100kWh
Battery Storage (BESS)

Beckmann's Bakery
In collaboration with ownership, MYNT converted a distressed facility into a solar powered commercial bakery with an energy value-add of $125k per year (~$.25/sqft). CO2 offset of 10k tons.
415kW
System Size

GraniteRock
Developed the second largest BTM solar project in PG&E territory on quarry brownfield. The 2nd oldest contractor in CA, GraniteRock achieved 65% energy savings. CO2 offset of 171k tons.
5.7MW
System Size

Fireclay Tile
Hand made tile manufacturer based in California achieves 60% energy offset with new rooftop PV and ESS installation.
580kW
System Size
500kWh
Battery Storage (BESS)

County of Monterey
Partnered to develop a solar + battery micro-grid for the county’s main administrative building. The project resulted in an estimated 25-year savings of $8.5 million. CO2 offset of 30k tons.
1.4MW
System Size
2,100kWh
Battery Storage (BESS)

Beckmann's Bakery
In collaboration with ownership, MYNT converted a distressed facility into a solar powered commercial bakery with an energy value-add of $125k per year (~$.25/sqft). CO2 offset of 10k tons.
415kW
System Size

GraniteRock
Developed the second largest BTM solar project in PG&E territory on quarry brownfield. The 2nd oldest contractor in CA, GraniteRock achieved 65% energy savings. CO2 offset of 171k tons.
5.7MW
System Size

Fireclay Tile
Hand made tile manufacturer based in California achieves 60% energy offset with new rooftop PV and ESS installation.
580kW
System Size
500kWh
Battery Storage (BESS)

County of Monterey
Partnered to develop a solar + battery micro-grid for the county’s main administrative building. The project resulted in an estimated 25-year savings of $8.5 million. CO2 offset of 30k tons.
1.4MW
System Size
2,100kWh
Battery Storage (BESS)

Beckmann's Bakery
In collaboration with ownership, MYNT converted a distressed facility into a solar powered commercial bakery with an energy value-add of $125k per year (~$.25/sqft). CO2 offset of 10k tons.
415kW
System Size

GraniteRock
Developed the second largest BTM solar project in PG&E territory on quarry brownfield. The 2nd oldest contractor in CA, GraniteRock achieved 65% energy savings. CO2 offset of 171k tons.
5.7MW
System Size

Fireclay Tile
Hand made tile manufacturer based in California achieves 60% energy offset with new rooftop PV and ESS installation.
580kW
System Size
500kWh
Battery Storage (BESS)

County of Monterey
Partnered to develop a solar + battery micro-grid for the county’s main administrative building. The project resulted in an estimated 25-year savings of $8.5 million. CO2 offset of 30k tons.
1.4MW
System Size
2,100kWh
Battery Storage (BESS)

Beckmann's Bakery
In collaboration with ownership, MYNT converted a distressed facility into a solar powered commercial bakery with an energy value-add of $125k per year (~$.25/sqft). CO2 offset of 10k tons.
415kW
System Size

GraniteRock
Developed the second largest BTM solar project in PG&E territory on quarry brownfield. The 2nd oldest contractor in CA, GraniteRock achieved 65% energy savings. CO2 offset of 171k tons.
5.7MW
System Size

Fireclay Tile
Hand made tile manufacturer based in California achieves 60% energy offset with new rooftop PV and ESS installation.
580kW
System Size
500kWh
Battery Storage (BESS)

County of Monterey
Partnered to develop a solar + battery micro-grid for the county’s main administrative building. The project resulted in an estimated 25-year savings of $8.5 million. CO2 offset of 30k tons.
1.4MW
System Size
2,100kWh
Battery Storage (BESS)

Beckmann's Bakery
In collaboration with ownership, MYNT converted a distressed facility into a solar powered commercial bakery with an energy value-add of $125k per year (~$.25/sqft). CO2 offset of 10k tons.
415kW
System Size

GraniteRock
Developed the second largest BTM solar project in PG&E territory on quarry brownfield. The 2nd oldest contractor in CA, GraniteRock achieved 65% energy savings. CO2 offset of 171k tons.
5.7MW
System Size

Fireclay Tile
Hand made tile manufacturer based in California achieves 60% energy offset with new rooftop PV and ESS installation.
580kW
System Size
500kWh
Battery Storage (BESS)

County of Monterey
Partnered to develop a solar + battery micro-grid for the county’s main administrative building. The project resulted in an estimated 25-year savings of $8.5 million. CO2 offset of 30k tons.
1.4MW
System Size
2,100kWh
Battery Storage (BESS)

Beckmann's Bakery
In collaboration with ownership, MYNT converted a distressed facility into a solar powered commercial bakery with an energy value-add of $125k per year (~$.25/sqft). CO2 offset of 10k tons.
415kW
System Size

GraniteRock
Developed the second largest BTM solar project in PG&E territory on quarry brownfield. The 2nd oldest contractor in CA, GraniteRock achieved 65% energy savings. CO2 offset of 171k tons.
5.7MW
System Size

Fireclay Tile
Hand made tile manufacturer based in California achieves 60% energy offset with new rooftop PV and ESS installation.
580kW
System Size
500kWh
Battery Storage (BESS)

County of Monterey
Partnered to develop a solar + battery micro-grid for the county’s main administrative building. The project resulted in an estimated 25-year savings of $8.5 million. CO2 offset of 30k tons.
1.4MW
System Size
2,100kWh
Battery Storage (BESS)

Beckmann's Bakery
In collaboration with ownership, MYNT converted a distressed facility into a solar powered commercial bakery with an energy value-add of $125k per year (~$.25/sqft). CO2 offset of 10k tons.
415kW
System Size

GraniteRock
Developed the second largest BTM solar project in PG&E territory on quarry brownfield. The 2nd oldest contractor in CA, GraniteRock achieved 65% energy savings. CO2 offset of 171k tons.
5.7MW
System Size

Fireclay Tile
Hand made tile manufacturer based in California achieves 60% energy offset with new rooftop PV and ESS installation.
580kW
System Size
500kWh
Battery Storage (BESS)

County of Monterey
Partnered to develop a solar + battery micro-grid for the county’s main administrative building. The project resulted in an estimated 25-year savings of $8.5 million. CO2 offset of 30k tons.
1.4MW
System Size
2,100kWh
Battery Storage (BESS)

Beckmann's Bakery
In collaboration with ownership, MYNT converted a distressed facility into a solar powered commercial bakery with an energy value-add of $125k per year (~$.25/sqft). CO2 offset of 10k tons.
415kW
System Size

GraniteRock
Developed the second largest BTM solar project in PG&E territory on quarry brownfield. The 2nd oldest contractor in CA, GraniteRock achieved 65% energy savings. CO2 offset of 171k tons.
5.7MW
System Size
Hit Us Up
Hit Us Up
MYNT Systems
111 Mission Street
Santa Cruz, CA 95060 USA
MYNT Systems
111 Mission Street
Santa Cruz, CA 95060 USA
MYNT Systems
111 Mission Street
Santa Cruz, CA 95060 USA
Phone: (408) 426-5420
Email: contact@myntsystems.com
Phone: (408) 426-5420
Email: contact@myntsystems.com
Phone: (408) 426-5420
Email: contact@myntsystems.com











